Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process. -Thank you!
No update needed, this is talking about a leakage test not a train check
Front #67
ABTH 105.2.1
An engineer will perform a Brake Pipe Leakage Test on a distributed power train. This can be done by pressing the Leakage Test soft key. The option to perform a leakage test will only be displayed on the screen when the train is ___________, and the automatic brake valve handle is in the _________________________ position.
Stopped; Suppression or Handle Off/Continuous Service
Answer: Stopped; Release or Minimum ReductionFeedback: The Air Flow method is the preferred method to use when conducting a brake pipe leakage test. If it is necessary to use the Brake Pipe Leakage Method, the acceptable leakage amount is under 5 psi. The leakage test does not have to be performed each time the train stops. That requirement falls under ABTH 105.5 Train Check.