Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process. -Thank you!
Front #65
ABTH 105.1
An engineer is in the process of linking the lead locomotive to the remote locomotives. This train has two DP remote consists. DP remote consist B is in the middle of the train. DP remote consist C is at the rear end of the train. When the engineer goes to link them, which remote consist will the engineer link to first?
Engineer must link to a locomotive in DP remote consist C first.
It doesn’t matter which DP remote consist the engineer links to first.
Engineer must link to a locomotive in DP remote consist B first.
Answer: Engineer must link to a locomotive in DP remote consist B first.Feedback: The order locomotives are linked is reflected on the DP control screen. An improper sequence could result in bad train handling and damage to equipment.