Engineer Training Flash Cards
ABTH Only
GCOR Only
Random Question
Weekend Study

Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process.
-Thank you!

What is wrong:

No Pending Requests Have Been Submited
Front #46

ABTH 104.7.1D

Which handle position reduces equalizing reservoir and brake pipe pressures to near equalization?


  1. Full Service (FS) position
  2. Release (REL) position
  3. Suppression (SUP) position
  4. Minimum (MIN) position
Back #46
Flag

ABTH 104.7.1D


Answer: Full Service (FS) position
Feedback:
The Full Service (FS) position is the second notch out of Release (REL), although it is separated from Minimum (MIN) by a portion of the Service Zone. This is part of the Service Zone. The Service Zone is everything from MIN to CS.