Engineer Training Flash Cards
ABTH Only
GCOR Only
Random Question
Weekend Study

Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process.
-Thank you!

What is wrong:

No Pending Requests Have Been Submited

Card has been updated: 1 time(s)
Front #40

ABTH 103.10

A penalty brake application could be initiated by which of the following devices? (Select all that apply.)


  1. Positive Train Control (PTC)
  2. Alertness device
  3. Overspeed device
  4. Trip Optimizer (TO)
Back #40
Flag

ABTH 103.10


Answer: - Alertness device - Overspeed device - Positive Train Control (PTC)
Feedback:
A penalty brake application causes a full-service brake pipe reduction. Cab signals and distributed power failures are also devices that can cause penalty brake applications.