Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process. -Thank you!
Front #289
GCOR 18.2
When taking charge of a train in PTC territory, or before entering PTC territory, what must the engineer confirm before the train can depart? (Select all that apply.)
The PTC circuit breakers and cut out switches are in the appropriate positions
The GTB covers the route of the train.
The PTC system is initialized on all locomotives in the head end consist
The PTC system on the controlling locomotive is initialized
Answer: - The PTC circuit breakers and cut out switches are in the appropriate positions - The PTC system on the controlling locomotive is initialized - The GTB covers the route of the train.Feedback: Crews are responsible for verifying the PTC system is initialized with the correct GTB number and ensuring the limits listed on the GTB encompass the entire route.