Engineer Training Flash Cards
ABTH Only
GCOR Only
Random Question
Weekend Study

Any question, rule number, or answer reported as wrong will get looked at manually in a couple of days. Please write what is wrong with this flash card and what it should be which will speed up the correction process.
-Thank you!

What is wrong:

No Pending Requests Have Been Submited
Front #249

GCOR 9.17

A train wants to enter the main track within CTC where no governing signal exists. What must happen before opening the main line switch?


  1. Open the switch, wait 5 minutes, then proceed at maximum authorized speed
  2. Open the switch, move 100 feet onto the main track, wait 5 minutes, then proceed at restricted speed
  3. Open the switch, wait 5 minutes, then proceed not exceeding 20 mph
  4. The control operator must verify that there are no conflicting movements before giving the authority
Back #249
Flag

GCOR 9.17


Answer: The control operator must verify that there are no conflicting movements before giving the authority
Feedback:
To enter CTC, a train can only be authorized to do so by a controlled signal displaying a Proceed indication or by receiving verbal authority is in one of the following ways: - Movement past a Stop signal per 9.12.1 - Verbal authority to enter the main track between block signals - Granted Track and Time under rule 10.3