A crew is kicking cars in the yard. One car has been kicked into track 19. The next car will be kicked into the adjacent track. When is it permissible for the 19 switch to be lined for the lead for the next move?


  1. Once the rear end of the car has cleared the 19 switch
  2. Once the car has coupled into the existing cars in track 19
  3. Once the leading end of the car has started into track 19 and is clear of the switch
  4. Once the car has passed the clearance point of track 19
Back #215
Flag

GCOR 8.2


Answer: Once the car has passed the clearance point of track 19
Feedback:
Ensure the car is in the clear in the track it is kicked into in case: - The car does not make it in the clear in the track or the car rolls back out of the track. Leaving the switch lined for that track allows the crew to correct these issues. - A car does roll back out of the track, the switch is lined for the route and will not be run through or damaged.